happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee General > Site Preparation and Management

IMG_8601.jpg
Diagonal Checks for Column PlacementThe correct placement of columns is important to the overall project to ensure that the wall angles are as they should be and the house is as designed. Often the only tool used is an external measure + the use of a small square. This shows one additional check, taken from the 3 4 5 triangle rule. If you measure 3 meters along one axis and 4 meters along another axis the diagonal should be 5 meters (or in this case 6, 8 and 10). This is done in addition to measuring the diagonals for equality.dozer
IMG_8603.jpg
SpacersConcrete spacers are produced in various sizes during the project. Spacers are used in all the foundation work of the house + the driveways and external walkways.dozer
IMG_8783.jpg
Log SheetA log sheet is utilized to keep track of all materials and tools, indicating the amount received, amount used, purpose, by whom and associated date.dozer
IMG_9316.jpg
Black Plastic for ProtectionHere the stone tiling covering the entry columns are being protected from paint splatter with black plastic. dozer
IMG_9350.jpg
Use of Black Plastic for Splatter ControlIn preparation for color render of the perimeter wall black plastic is used extensively to protect surrounding areas of splatter.dozer
     
17 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide