Shower Enclosure BeamA ground beam is set up to be poured where the shower enclosure will go. dozer
|
|
PVC Pipe LidsAll PVC piping is covered to prevent concrete or other blockage from getting in it. Also the covers allow the inbound lines to be pressure tested. dozer
|
|
Drain Pipes / Inbound WaterAll of the PVC piping is wired into place prior to setting in concrete to prevent it from angling during the pour. dozer
|
|
Setting Up the PumpBefore getting too far the pump needs to be set up for so the inbound lines can be pressure tested. Any problems can be checked/fixed before concrete is poured over any piping. dozer
|
|
Rough Plumbing LayoutAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer
|
|
Preliminary Layout of Septic AccessAfter this we vented the septics and change the access lids to the 6" heavy duty type. dozer
|
|
6" Septic PVC Access and LidThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozer
|
|
Septic CoversScraping the bronze septic lids after the concrete walkway pour. dozer
|
|
Bathroom LayoutBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer
|
|
Rough Bathroom LayoutsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozer
|
|
Cementing the Shower FloorLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer
|
|
Recessed Shower FlooringThe shower flooring is recessed to create a step down into the shower enclosure. dozer
|
|
|
|
|
|