Junction BoxesVarious junction boxes and conduit routing in the attic. Notice that conduit is wired in place so it does not lay on the drywall ceiling. dozer
Attic Light SwitchAttic fitted with florescent lighting and surface mounted switch box. dozer
TV Satillite Routing CableThe external box which holds the RG6 cable routing. There are two cables coming in and 4 cables going out to feed the various TV connections. This splitter is powered (it is unplugged in the picture).dozer
Satellite InstallationThe satellite installer installing the thaicom satellite dish. This could not be done by the electrician since the satellite installer has special equipment for tuning the equipment. The labor for the installation was 1500 b.dozer
Remote SwitchThe remote switch for the one extra exterior light that we wired in after the fact. dozer
Short One SwitchWe decided later we needed one additional eves light. There is a remote switch for the box so no hard wired switch is needed. dozer
Concrete Hole Drill BitThe A/C guy had a nice drill bit to drill through concrete or aerated block. Much nicer than the hammer and chisel approach. dozer
A/C Mounting PlateThe A/C mounting plate with the wires run by the original electrician. dozer
A/C Unit InstalledOne A/C unit is fit into place.dozer
Wire Nut ConnectorsTop view of the yellow electrical conduit and electric wires being attached with wire nut tapeless connection points and then being run into the top of the down light with white flexi conduit. dozer
Connection to Underground WiringThe connection from the meter to the underground wiring via the HDPE underground conduit and a connection cover plate. dozer