happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Shastadad > Shastadad House Project

011.JPG
permanent water meter re-cemented Shastadad
009.JPG
Shastadad
IMG_2937.JPG
main line awaiting electric company hook upin the same vein. last time main wire was left exposed it was stolen resulting in a 29,000 THB replacement cost, yet they never learnShastadad
IMG_2955.JPG
wire protectorsometimes you just have to do it yourself or it won't get doneShastadad
IMG_2954.JPG
relative simple fix, old can with bottom cut out and a steel rod through the bottom held on by lock, will not stop a determined thief but will discourage a casual one while we await electric co hook upShastadad
IMG_2894.JPG
French door refrigerator / freezerShastadad
IMG_2895.JPG
kitchen vent install Shastadad
IMG_2896.JPG
electric room tiledShastadad
IMG_2910.JPG
master bath block windowShastadad
IMG_2909.JPG
Shastadad
IMG_2924.JPG
master bath block window from outsideShastadad
IMG_2918.JPG
shower door in guest bathShastadad
769 files on 65 page(s) 41

Debug Info 
Debug Output: show / hide