happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > changnoi > Week 32 - Windows & Doors

US_Bathroom_tiled_and_floored.jpg
Upstairs bathroom Tiled and Sink Unit builtchangnoi
ds_loo_floor_drain.jpg
Drain Plugs in Bathroom Floorchangnoi
us_bedroom_doors_in_one_wrong.jpg
Upstairs Bedroom DoorsHmm that looks like our back doorchangnoi
back_door_wrong_one.jpg
Ahh thats where the other bedroom door wentOn the Back Doorchangnoi
back_door_lock_on_wrong_door.jpg
Locks On DoorsThe same external door lock on the same wrong doorchangnoi
back_door_lock_on_wrong_door2.jpg
Locks on DoorsHmm Back Door Lock on Internal Bedroom Door I dont think sochangnoi
master_ensuite_door_in.jpg
Master Ensuite Bathroom Doorchangnoi
master_ensuite_door_in_2.jpg
Master Ensuite Bathroom Doorchangnoi
US_Deck_tile_start.jpg
Upstairs Balconey Tilingchangnoi
DS_deck_tile_start.jpg
Downstairs Deck Tiling StartedThis will get bordered with a sandwashchangnoi
not_sure_door.jpg
Our Master Bedroom hmmm Wrong doorchangnoi
 
23 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide