18 MayThe 2 Sparkies preping the PE pipepklongball
19 MayHere we can see the NYY cable and the now attached pull rope.pklongball
19 MayThe two PE pipes that will have the main supply cable and the telephone cable pulled in. We will have two phone cables in the smaller one along with an extra pull wire for future cable TVpklongball
19 MayAnother view of the pull rope disappearing into the PE pipepklongball
19 MayIn this shot Sparky is guiding the pull rope into the PE pipe. They started with a pull wire/cable and attached a pulling rope and attached this to the NYY cable.pklongball
19 MayHere we have Sparky just starting to feed the 4 conductor NYY cable into the PE pipe. The 16mm2 cable is 65 meters long and very heavy.pklongball