happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions - Max&Bee-in-CM
IMG_0871.JPG
Welding cross beams for the trussMax&Bee-in-CMSep 29, 2010
IMG_0612.JPG
Beams for making the truss structure are paintedMax&Bee-in-CMSep 29, 2010
IMG_0616.JPG
The (incompetent?) roof metal guy thinks about how to jack up the roofMaybe incompetent is too strong a word - but he was quick to assign blame to poor quality metal, bad architect, bad engineer, CPAC tiles too heavy, roof too big, etc - everyone except himself.Max&Bee-in-CMSep 29, 2010
IMG_0617.JPG
Jacking up the sagging beamA few car jacks were used to straighten out the sagging beams, before the truss structure was welded into placeMax&Bee-in-CMSep 29, 2010
IMG_0714.JPG
House in limboWork on the concrete floor, walls, tiles cannot continue as we do repairs to the roof metalMax&Bee-in-CMSep 29, 2010
IMG_0814.JPG
Repairing the roofThe roof structure is being converted into a truss systemMax&Bee-in-CMSep 29, 2010
IMG_0570.JPG
Space foil insulation under the tilesMax&Bee-in-CMSep 29, 2010
IMG_0572.JPG
Space foil insulation under the tilesMax&Bee-in-CMSep 29, 2010
IMG_0573.JPG
Space foil insulation under the tilesMax&Bee-in-CMSep 29, 2010
IMG_0582.JPG
Tile installation stops before the front is finished to begin repair work on the saggingMax&Bee-in-CMSep 29, 2010
IMG_0588_-_Sagging.jpg
The metal beams begin to sag under the weight of the tilesMax&Bee-in-CMSep 29, 2010
IMG_0430~0.JPG
Installing the tilesMax&Bee-in-CMSep 27, 2010