Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Sat Jan 31, 2015 2:08 pm

The start of the slow build of Baan P'Nui and Jerome.

image.jpg
Stage 1 provisional plans, to be revised, Front


The 2 part roof at the front is going to become 1.

The upper windows will reduce in hight by 50 cm (currently 1 metre) & so upper roof will be lowered

Roof overhang will increase from 1.5 to 2.5 meters

image.jpg
Stage 1 provisional plans, to be revised, floor plan.


image.jpg
My concept sketchup model
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby fredlk » Sat Jan 31, 2015 2:43 pm

I'm missing the 2nd floor .....
I'm sure I saw it in your iPad or is my Oldtimer's really kicking in?
User avatar
fredlk
 
Posts: 5879
Joined: Tue Apr 07, 2009 3:11 pm

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Sat Jan 31, 2015 3:16 pm

fredlk wrote:I'm missing the 2nd floor .....
I'm sure I saw it in your iPad or is my Oldtimer's really kicking in?

No you Oldtimer's still not here yet.

SWMBO decreed that she doesn't want to clean the second floor so it's gone and the ground floor grew a bit.
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby pipoz » Sat Feb 28, 2015 10:54 am

Thanks fixed up the Fan drop pole mounted issue, with them.

Spoke with him yesterday and got confirmation it was a DR Model (the drop pole mounted) and not a HR Model (ceiling mounted)

pipoz
User avatar
pipoz
 
Posts: 1917
Joined: Mon Jan 23, 2012 10:41 pm
Location: Udon Thani Sometimes

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Sat Aug 08, 2015 10:11 pm

Moving along slowly but moving.

We have just had a visit by our architect and a professor who has a sideline business testing the load bearing qualities of soil for building locations.

image.jpg
Soil strength testing


image.jpg
Core sample


After getting the results from the testing our foundations may be able to be reduced in size.
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby pipoz » Tue Aug 11, 2015 12:23 pm

Interesting, I would have dug a hole 1.5 m deep and done on a CBR or Plate Bearing Test, unless of course you suspect a problem with the soil strata beneath that. Suppose it depends on whether you are also in a flood prone area

Are you planning on Piles or Pad Footings for your foundation

pipoz
Attachments
Plate Bearing Test - 1.gif
Plate Bearing Test - 1
User avatar
pipoz
 
Posts: 1917
Joined: Mon Jan 23, 2012 10:41 pm
Location: Udon Thani Sometimes

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Tue Aug 11, 2015 2:20 pm

pipoz wrote:Interesting, I would have dug a hole 1.5 m deep and done on a CBR or Plate Bearing Test, unless of course you suspect a problem with the soil strata beneath that. Suppose it depends on whether you are also in a flood prone area

Are you planning on Piles or Pad Footings for your foundation

pipoz

We just went with the recommendation of our architect. I suspect that a CBR would have taken very much longer than the 4 or so hours, and I'm not sure if it's available. That's why we used an STP (STANDARD PENETRATION TEST)

As to flooding, no risk. As to foundations they will be pad as probably piles, unless drilled, would be impossible. At the moment our foundations are based on an 8ton per sqm but it is much more likely that our soil is 30 tons or higher we are still waiting on the report.
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Sun Nov 01, 2015 4:30 pm

Things are moving along.

The foundations will now be 1 meter deep. This is well within the fill we added, as it has compacted nicely

image.jpg
STP results


There has also been a first ceremony asking the Buddha for good luck, I've just heard that the lottery number today is 11 and that's the scheduled official start day, so maybe it worked :?

image.jpg
The local Buddha


There was an offering of a pigs head.

image.jpg
pigs head Offering


That in true frugal Thai style was then eaten by SWMBO and friends.
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Sun Nov 01, 2015 4:42 pm

We also located the kind of floor drain I've been looking for in Bangkok.

image.jpg
Linear drain 1


image.jpg
Linear drain 2


image.jpg
Floor fitting
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Mon Nov 02, 2015 4:52 pm

I forgot to post the revised plans

image.jpg
Front of the house


image.jpg
Floor plan, almost final


There will be a slight change the ramp will be narrowed to allow for 2 vehicles parked in front of the loading bay door
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Tue Nov 10, 2015 1:52 pm

I also have a first approximation Sketchup model that has been revised and a final version CAD file

image.jpg
Sketchup front view


image.jpg
Sketchup side view


image.jpg
CAD side view final
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Tue Nov 10, 2015 1:57 pm

We have had the land God ceremony, a small short affair that has to take place before breaking ground

image.jpg


image.jpg


image.jpg


image.jpg
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Tue Nov 10, 2015 2:18 pm

As I mentioned before The official start of building, the Sao Ek- Sao Toe first post ceremony is tomorrow 11/11

image.jpg
Architect marking out foundation


In preparation for that we have a lot of holes. And as wh have about 30 of various sizes we got a baby maco

image.jpg
Baby Maco


image.jpg
Baby Maco And SWMBO


image.jpg
Double foundation hole


image.jpg
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Thu Nov 12, 2015 10:03 am

Yesterday was the official start of building, the Sao Ek- Sao Toe first post ceremony

SWMBO was very happy with how it went and has gained a lot of "face" because of the guests who came including the OrBoTor, teachers, village heads and others

image.jpg
Footing rebar 150 mm off the base, as specified by our architect.


image.jpg
Everyone helping for luck


image.jpg
Guests adding money to the fish trap for luck


image.jpg
Nui putting in our good luck money under every post 9฿ For every one


image.jpg
A cousin also adding good luck money
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Workshop and house, Non Sa-At ½ way between KK & Udon

Postby Sometimewoodworker » Thu Nov 12, 2015 10:46 am

More 11-11 pics

image.jpg
SWMBO dressed up for the ceremony


image.jpg
Thai and food


image.jpg
Eating


image.jpg
Very proud Grand mum because everyone is paying respect to her
Sometimewoodworker
 
Posts: 1853
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo