P8010334.JPG
dozerAug 05, 2013
IMG_8490.jpg
The poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozerSep 28, 2011
IMG_8491.jpg
3 hun (9 mm) the specification of the metal strength. For higher grade metals they will have the strength specification imprinted on the metal surface, in this case SR 24. dozerSep 28, 2011
IMG_8485.jpg
The upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozerSep 28, 2011
IMG_8518.jpg
Existing section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozerSep 28, 2011
IMG_8517.jpg
The rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozerSep 28, 2011
IMG_8515.jpg
On 40 meter section prior to completion. dozerSep 28, 2011
IMG_8514.jpg
One worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozerSep 28, 2011
IMG_8513.jpg
Sprinkling water on the wall surface during the rendering process. dozerSep 28, 2011
IMG_8505.jpg
Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozerSep 28, 2011
IMG_8502.jpg
Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozerSep 28, 2011
IMG_8484.jpg
Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozerSep 28, 2011