Last additions - Rick B's Gallery |
View of side deckRick BJan 20, 2009
|
|
Rear and side view of houseRick BJan 20, 2009
|
|
The family chedi in the back yardRick BJan 20, 2009
|
|
View of driveway just pouredRick BJan 20, 2009
|
|
Random files - Rick B's Gallery |
View of side deck roof steel on leftRick B
|
|
Forms and rebar for the first floor beams are ready for the concrete pour.Rick B
|
|
Side deck steps after being tiledRick B
|
|
Rebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick B
|
|
Wooden stairs being installedRick B
|
|
Upper Roof SteelThe upper roof support steel is in place. This work took about one week from start to this point.Rick B
|
|
|
Front of House with First Floor BlockworkWindow and door frames and blockwork for the first floor nearing completion.Rick B
|
|
|
|
|